This is an evolving process and I don't have a definite plan in mind yet. The mist has cleared a little though.
The first iteration is going to be kept simple so I can try out some ideas, especially around track building. A short continuous run to allow Peter Jones to run, and a long siding leading to a basic yard or quay. It is going to be a mineral line, so no station. Whilst it is going to be a ground-level line the construction will have to take into account how much the ground moves in these parts.
What I'm most worried about at the moment is not copying recognisable aspects of other 7/8ths lines. For instance, there will be no preservation society sharing the line. There is some stock already built that I might dispose of because they seem cliched now..
A bit of an accident meant that I had to recover a lot of my olf 16mm stock from a watery grave. As is often the way a coincidental event meant I came across some old photos of it in use.
As well as summing up my less is more thinking they might even make me consider a very simple battery operated line gfor one of the raised vbegetable beds.
Sounds like my sort of railway James.
ReplyDelete