Thursday, 16 January 2014

In an octopus's garden

I hate to admit that I sometimes read the Daily Mail, but sometimes I need a good laugh.

Anyway I came across this article in it today about landscape dioramas built underwater in aquarium tanks.

Tank Warfare

I don't think we are in any place to judge other people's hobbies, but what I found interesting is the techniques they've used to create a sense of depth and how rarely, if ever, I've seen the same techniques on a model railway.

Take the third photo down where the light is shining through the trees at horizon level, or the one at the bottom.

Perhaps there is a future for plain back-scenes after all.

Thursday, 9 January 2014

Shedding some light on priorities

If I'd continued down the line of using Tillig track as a halfway house to going finescale I would now be ready to get on and get something built.

Shifting to EM feels like starting all over again with the need to progress track, rolling stock and everything else in a sensible order and at the pace at which I can produce them. and make investments in the necessary tools and jigs.

Although I'm generally a bit of a whizz at using project planning software in my day job I have an intrinsic dislike of it and the type of mindset it seems to encourage. There are times though, and this is one of them, where it can be really useful.

Since I consider Microsoft Project too expensive for personal use I'm going to recommend  the open source alternative GanttProject . This can read and write MS Project files if you need to do so for any reason.

For those of you unfamiliar with project planning software it lets you organise all the tasks you need to do in a granular way, and map their interdependencies with each other and with the "resources" needed to complete them. The end result should be a prioritized and costed plan that, depending on the logic you've used, gives a good indication of the timeline it will take to complete.

All good in theory but as usual the old IT adage of Garbage In > Gospel Out applies with people tending to mistake a plan based on multiple assumptions for what should happen in reality. The types of project I run in the real world are in areas that I know very well, so if the plan says it will take six months but I know it will take a year I tend to ignore what the plan says.

This really annoys my German colleagues.

What putting things into a plan can do is help you pick out dependencies you hadn't realised were there, to plan out expenditure and, though this only works if you are dealing with a good project manager, an insight into what really matters that you didn't know before you started planning.  Hopefully that stops people wasting time doing things that aren't important just at the minute" at the expense of long term objectives.

So I'm now a man with a plan, though it hasn't been influencing what I need to do as much as it should because some items only come up for sale on eBay from time to time and you have to grab them whilst they are there...

...So I've finally got hold of a Bachmann chassis to put under a Hornby Class 25 body, so a project that was on a back-burner turned down low is suddenly boiling away, and I've realised that buying those parts from Brassmasters at Warley was actually on my Critical Path. Just a pity I didn't buy them at the time...

...never mind ordering EM wheel sets to fit in with the extended delivery schedule from the otherwise wholly admirable Ultrascale

Meanwhile that AC railcar that arrived whilst I was discussing with my darling wife why I couldn't afford to fix the step-daughter's car has skewed the plan a little.



And this is where I do the clever segue into the question of lighting.

I finally accepted how bad the lighting in my home office was during the point building. I'd actually forgotten that as a house built off plan several rooms, including my home office, were equipped by default with "warm, low energy lighting." Couple that with a large window that somehow only every manages to illuminate my desk and you have a recipe for modelling, and photographic, disaster.

So I've shifted to the consistent use of 6500k lamps. If you are quick you might still pick up some of these bargains.   They are very, very blue. But on the other hand they've made it so much easier to see things clearly.

That also means revealing a few things that I would rather not see, in terms of my shoddy workmanship to date, but even that is a good thing really of course.





Monday, 6 January 2014

"Modern" Image on the Tanat Valley

Whilst going through a second hand Railway Modeller recently this battered and faded print fell out from between the pages. It must have been a secret test run of the then brand new AC railbus to determine if reinstating passenger services was viable.



Wednesday, 1 January 2014

The Lessons of the Point - Part 2

Before I go any further can I recommend David Nicolson's article on 7mm point building in the current MRJ. (Issues 227) Although about building S7 pointwork most of the content is equally applicable in 4mm scale. Had I delayed building my first turnout until after reading it and I would have avoided my big whoops.

Iain Rice's An Approach to Building Finescale Track has been my main guide up until now. Iain suggests, and I think it is a great idea when layout building, to build the longest possible track sections off the layout directly on the paper templates and with ballasting done before any rails are laid. At the end of construction this can be lifted as a unit and laid onto a resilient foam trackbed. I'm sure I can't be the only person to have suffered the frustration of what was a perfectly functioning RTR turnout becoming a major problem after ballasting so this approach sounds very attractive. However it is one of those things that in retrospect I wouldn't have chosen to do for my very first attempt at a turnout.  Too much information can be lost when the template is ballasted over even if you keep a spare copy and copy key information over to the edge of the template away from the ballasted area.

The specific problem I had was being caught out by a point that both Iain and David make. If the templates are going to form part of the final trackbed it is is important to use the right kind of paper.

Now normally my printer is loaded with good quality paper, though of differing sorts, because I use it for my job. So when I produced my first section of plain track using the "ballasting first" approach I didn't have any problems. What I'd forgotten was one of the step children had dumped an unwanted pack of cheap and cheerful paper into my paper tray.

This, by itself, nearly scuppered my attempt before it had started. The dilute PVA glue mix that had worked perfectly well for the plain track was absorbed very unevenly by this different paper. In some case the glue appeared to soak in and failed to bond any of the ballast. In other places the paper simply disintegrated.

So I re-ballasted and turned to the method I'd used on Apa, applying "Quick Shine" - a Klear type product, to ballast that was already in place. Unfortunately the top of the bottle came of and spilt it everywhere. This wouldn't have been so bad if I'd cut the TimberTracks base away from its supporting structure and cut the webs between the timbers. Because I hadn't done so. the soaked  plywood  curled away from the baseboard with the ends an inch or so above the trackbed.

At this point I came close to giving up.

A change of glue, reprinting the templates, cutting the point timbers free of their frame and the application of a lot of weight recovered the situation to some degree.

It was then that I managed to break the common crossing and had to resolder that as well.

I wasn't sure whether to begin construction by placing the common crossing or by laying the straight stock rail. I did the latter in the end but I'm still not sure it was the right approach.

After that construction actually became rather fun, although it is amazing how quickly you develop the ability to spot a dropped 4mm scale chair on a carpet.

Construction would certainly have been quicker if I'd had a better workflow for putting the chairs on  whilst also keeping an eye on which way round the keys were meant to go. However although the chairs are best slid on to the rail it is possible to also spring them on and off by flexing their base as long as you fix them to the timbers soon afterwards to avoid them dropping off. In the worst case scenario it is also quite easy to cut the chairs in half and apply a piece to each side if you don't discover the mistake early enough.

Costs are kept down by only supplying normal running chairs and slide chairs. Chairs to had the common crossing and the check rails in place are made by cutting these in half. One thing I didn't pick up from either the instructions or the template is when the best type of chair to cut was a normal keyed chair or a slide chair. I must go back and check if that was me missing something in the instructions or if it isn't covered by them. Other than that the trimming was much much easier than I'd expected.

The other thing that caught me out was not tinning the rail and attaching the  wires at the right point in construction. The tolerances on the fit between the chair and the rail ios quite tight and it didn't prove possible to slide a chair over a tinned section of rail. All that meant was I had to start threading  the chairs on from the other end.

Oh yes, and I half forgot to cut slots to allow for an under baseboard tie bar, but that was because I kept changing my mind about whether I was going to continue with the lift and shift idea post construction.

In the end I did, and despite the various escapades with glue it lifted away quite easily and has produced a surprisingly rigid and robust piece of trackwork. I still need to address the tie bar issue though.

Two final observations. You really can't have enough of two things - track gauges and weights!









Tuesday, 31 December 2013

The Year Ahead and Behind

It is that time of year when Blogger shows you a full 12 months of posts down the right hand side of the page and you click on January to see what has changed since then.

From this


To this


Quite incredible progress, I'm sure you'll agree.

Of course in reality there is a big difference between a RTR 16.5mm turnout and a hand built 18mm gauge one, although I still think that the Tillig track has much to recommend it. All the same if I have a regret now it is that I didn't build Apa in EM.

However, I did build Apa, and it is more or less finished and time to mover on to the next project. With careful choice of camera angle and some post processing I'm quite pleased with how Apa turned out.


So what did I learn in 2013?

A lot was about observation and layers of seeing. There are elements of the overall mix that make up a convincing layout that perhaps I hadn't realised were important before, perhaps because I hadn't consciously observed them when looking at the real world.  I'm amazed how I can still find things in photos of the TVR that are blindingly obvious once you've noticed them.

One result of this is that I'm much more aware of track work, point rodding signal cables and other things of that ilk. In the past I've know they were there, but only in a vague sense that they were part of the picture.

Colour is something else I think I understand a  little better than I did before but I still struggle to produce the colours I want first time around, as evidenced by  the multiple repaints of the goods yard and the stone bridge. One major investment I'm making this year, to benefit my photography as well as my modelling, is to shift to the consistent use of 6500k lighting in the study.


Looking Forward to 2014

I've also got  a much better idea of the skills  I need to develop before building a proper layout, which helps set the agenda for the next intermediate project that I'm planning for the next eighteen months or so.

Top of that list is to shift the emphasis towards track and  a few key items of rolling stock. the scenics can sort of take care of themselves although I do want to build new versions of all the buildings.

Saturday, 28 December 2013

Playing Around in Templot


Now how did that happen?

Printed out and with the TVR goods shed  placed on the plan it still seems to work, though the narrow clearance in the loop doesn't look right.



Which leads on to this iteration. The turnouts are B6 except fir the one to the goods shed that is an A5 but still gives a minimum radius of  42" that I hope will just about be acceptable for shunting with a 14XX.



To make it believable will mean some scenic tricks and obviously the small TVR buildings are going to help. Having just measured up the  load space in the new car* I guess  I can go up to 18" baseboard width if I can keep the weight down.

My mind tells me the best approach is to flip it over so the goods yard is at the front and to place the platform on the loop, but my heart wants to keep it this way and keep to the "bitsa" station idea I used on Apa, bearing in mind in theory there shouldn't be any passenger services except the odd brakevan special.


*That is if she doesn't crash it again - a week old and it is already in the body shop.

Friday, 27 December 2013

The Lessons of the Point - Part 1

So much has been written about how to build points that you would think there was nothing left to find out for yourself. As a beginner though that is part of the problem. Such is the volume of what has been written that it is hard to filter out the essentials you need during the nerve wracking exercise of building that first point. Much that is written is also influenced by the unconscious competence of those writing it.

In my professional life this is something that is exercising much of my time at the moment. How do you distill the wisdom of experts into a form that allows the less experienced to follow their advice and get short term results that are satisficory whilst also providing a foundation that doesn't constrain future development.

So here are my initial notes on building that first EM gauge point using the C+L system . I will hopefully update it in the light of the next five I have to build in the coming months. Mostly it is litany of the mistakes I made, and needs to be read in conjunction with much of that good advice which is out there.

Choice of construction

I'd built a few copperclad turnouts in OO9 a long time ago and was tempted to make a start using that method in EM gauge, using the SMP kits. I might still buy one to try since they are so cheap. To be honest if I need to build a single slip, a feature of so many Iain Rice trackplans, I think I would go that way until I've built up an awful lot more confidence. The other appealing aspects of copperclad are speed of construction, which can also equate to speed of learning, and the ease with which mistakes can be rectified with the touch of a soldering iron.

So why did I go for the C+L system? Well I already had a stash of EMGS ply sleepers so I thought the TimberTracks base would be a good visual fit, I wanted to use steel track, and I know that on the finished layout I wanted to use the correct pattern of chairs and retrofitting them on to a copperclad point sounded like hard work. In retrospect I don't think it would have been since the C+L chairs are very easy to cut in half. There is also this alternative from  PH Designs that could be worth investigating.

My one concern with the C+L route was the need to get it right first time without that get out of jail free card of a dab of the soldering iron. In a post that is going to be littered with cliches I have to admit that turned out to be a red herring. Not only does the system allow some time for adjustment before the bond sets but it also proved quite easy to correct mistakes either by refloating the chair with more butanone, or by slicing it off and putting on a new chair, either by flexing it on to the rail or slicing it in two and applying the halves separately.

It appears there might be supply issues around the TimberTracks bases, and since most of the turnouts I need are going to be built on Templot templates this might have proven to be a bit of a cul de sac. Something else I hadn't realised, though I guess it was obvious, is that that the template provided with the C+L kit doesn't match the timbering of the TimberTracks base, which made life more difficult than it needed to have been when it came to using the template as a reference. Once I'd realised that I actually produced a rough template using TRAX 3, which allowed me to extend the rails beyond the length of the turnout, and then copied over the  relevant information. I made a mistake in doing this so I have one less slide chair on  one side than I should. .

The C+L kits are a good starting point (sorry) especially for those like me who struggle to find their way around the C+L product range and website. However they certainly aren't cheap.  I was also under whelmed by the instructions which seemed rather dense and in need of a lot more illustrations in place of words.

The common crossing must be a big part of the cost of these kits, since they are £16 to buy by themselves. If that wasn't incentive enough to learn how to make your own I'll also add that I manged to break the common crossing in my kit, which isn't surprising given the amount of handling it got as I played around with it, as any beginner is wont to do. Re-soldering it proved to be a trivial job and another confidence booster. So building my own in future is definitely a skill I want to develop.

My overall conclusion is I'm going to stick with C+L chairs on timber sleepers, but use Templot templates and in the longer term make my own common crossings.

Before Beginning

I think this is an area that many experts don't address from a tyro's perspective.

I cannot emphasize enough that building your first turnout to prove to yourself that you can do it is NOT the same as batch building turnouts for a layout. A workflow that works in the latter case can be full of pitfalls for someone in the first situation.

In particular in retrospect I wish I'd had a complete list of instructions to follow which also included notes on what was essential to get right at that stage and what would fall into place at a later stage.

Now I thought I did have a complete list of instructions. In fact I thought I had several complete lists. But I didn't. Not complete as in the old WW2 US Navy approach of designing everything so it could be operated by a farm boy from the Midwest.  Some things that were missing because the author obviously thought no builder could be stupid enough to not do it, others appeared out of construction order. I suspect much of what I write in the next few weeks will be on the subject of tiebars, but they are a prime example. In books and articles they are almost always referred to as an afterthought, but they aren't. In fact in many cases the author ends with a casual "Now fit the tiebar" . So I got to the end of building my point and realized that the inadequate provision I'd made for fitting a tie bar was going to be a major handicap.  OK, it was easy enough to fit something that worked, but not the sort of tiebar I'd been planning to fit.

A quick diversion here about one of the reasons why I'm building my own points. It was at Warley a few years ago and I was watching a really nice OO9 layout. I was really impressed until the CLUNK as a Peco point underwent the quantum change from being set from one road to the other. It wan't just that unrealistically sudden switching that ruined they illusion for me, it was that that it drew attention to that area of a RTR point that we all like to pretend doesn't exist.

Anyway a complete list of instructions is a must, so I'm going to create my own for next time, including a lot of copying and pasting so that things appear in the right order, and with the use of


large bold type

to remind me of things I'm likely to forget, like drilling holes fro the dropper wires or  not tinning the underside of rails before I've slid the sleepers on.

And I'm going to include tick boxes to make sure I've done what I should have done before proceeding to the next stage.

Incidentally I built an A4 turnout for my first attempt. This was influenced by the remote possibility that I might replace the track on Apa with EM. If I had done it would have  looked like this

Gauge conversion thanks to Photoshop.Once again I forgot to check the state of the fence, but trust me it has now popped back into shape thanks to the elastic "wire"
However I wouldn't recommend that choice. As is so often the case with modelling a smaller prototype is harder work and the tight radius makes this quite difficult to build accurately.  I think a B6 would probably be ideal.

Apart from compiling the list of instructions the other thing I should have done at this stage is to remove the chairs from their sprues and put the left and right handed ones in clearly distinguishable containers. This would have saved a lot of time later.

One other big takeaway from this stage, and it was the cause of some of my problems, is to decide whether you are building it in situ, or for installation elsewhere, and whether or not to ballast before laying the rails. I'll explain in my next post....