Showing posts with label Layout Design. Show all posts
Showing posts with label Layout Design. Show all posts

Monday, 26 May 2014

Good Enough For All Practical Purposes

Mike Cougill's excellent and thought provoking blog has been looking at the concept of the Freedom Layout again. In doing so he has referred to a formula familiar to project managers around the world that essentially boils down to "You can't have everything"

Mike explicitly talked about cost, size, quality and time as the main elements that need to be optimised if a layout is going to get built and not be a millstone around the owners neck.

From where I'm sitting on the learning curve I would have to suggest there are two other factors, and to complicate things they aren't static.

One is skill. I'm very aware that my skills have improved since returning to the small scale side of the hobby, but at the same time I'm learning new skills I'm also coming across new barriers of incompetence. I don't want to limit my modelling to what I know I can achieve today, but at the same time I don't want to be so ambitious that I reduce the chance of success.

The second is prototype knowledge.

When I set off on this journey I thought I was reasonably knowledgeable about railways. In fact if the conversation is about narrow gauge railways of the British Isles I can probably hold my own in a pub conversation.

What I didn't realise is the extent of my ignorance about certain aspects of standard gauge railways that I now think are essential for building a realistic model. Point rodding is an obvious example, but only one of many. Frankly I had no idea how the brakes really worked on wagons - and didn't need to until I started to think about how to model them.

There is, I suspect, a third factor, which is the point at which additional effort becomes of limited value in adding to the overall effect. I suspect it will be sometime before I have to worry about reaching that point.

All of which brings me back to TaOC again.

Whilst travelling and the weather have both been interfering with my modelling they haven't completely stopped me thinking about it, and the actual degree of compromise I'm prepared to accept. If I was building it in OO I think even at my usual glacial place I would have it up and running by now, but then what would be the fun in that?

Should I have gone with copperclad  trackwork though? That would have speeded things up even in EM.

So would going with the track plan as it came out of Trax, but I made the call that I wanted to put the final plan together in Templot so I have more guidance when converting the template to track and so I can sort out things like conflicts between timbering and sleepers.

So that is what most of my bank holiday Monday has involved, and here is the Templot design as it currently stands. A little more tweaking is needed but it just about works.


I've tried to get it as close to Roy's original design as possible whilst still using A6 points. Ideally I would have liked to use B6. For comparison this is how my Trax version looked.  At the end of the day there isn't much in it. I used A5 points in the Trax version but I don't think the space saving was worthwhile.






Tuesday, 18 March 2014

Baseboards and Things

I'm a past master of procrastination. Like Douglas Adams I love deadlines because of the whooshing sound they make as they fly by

This week I have mostly been not building baseboards.

I've charged the jigsaw, I've got out the trusty but slightly rusty Workmate. I've been to the back of the shed and retrieved both my first attempt at a 4'x2' effort and the remaining timber and plywood.

And I've stared at it all from lots of different angles.

What I haven't done is started to build the baseboards.

There are three reasons why:

The first is I keep looking at the minute luggage space in our new car, an IQ, and wondering how I could ever get anything to fit. Realistically I think 2'6" x 18" might be the maximum board size that would fit, allowing for some way of stacking the boards. To put how small it is in to context we can no longer use a normal shopping trolley if we want to get the groceries home. Of course I'm not planning to transport the layout that often, if at all, but I know if I don't plan for it the need will arise..

Secondly I need to think about how any layout is going to fit into my home office, both during construction and once built. the real challenge is that I don't have space for both a layout and a workbench. That actually favours a slightly larger baseboard so that it can double as a workbench in the early stage of layout building - which in my case could easily mean at least a couple of years.

Thirdly there is that terrible fear of settling on a final decision and then having to live with it. I've changed my mind about the final form I want the layout to take several times before breakfast today.

This was one of the crazier ideas, with a proscenium arch obscuring much of the view and the track curving out towards a removable  fiddle yard placed at the front of the layout for operation so trains seem to appear from "somewhere" rather than just from the stage wings.



Apologies for the poor drawing, I've just changed my mouse and mouse mat and I haven't got used to it yet.

The damp patch?

 Reason number four: whilst I was procrastinating one of the dogs cocked his leg on it all.






Saturday, 28 December 2013

Playing Around in Templot


Now how did that happen?

Printed out and with the TVR goods shed  placed on the plan it still seems to work, though the narrow clearance in the loop doesn't look right.



Which leads on to this iteration. The turnouts are B6 except fir the one to the goods shed that is an A5 but still gives a minimum radius of  42" that I hope will just about be acceptable for shunting with a 14XX.



To make it believable will mean some scenic tricks and obviously the small TVR buildings are going to help. Having just measured up the  load space in the new car* I guess  I can go up to 18" baseboard width if I can keep the weight down.

My mind tells me the best approach is to flip it over so the goods yard is at the front and to place the platform on the loop, but my heart wants to keep it this way and keep to the "bitsa" station idea I used on Apa, bearing in mind in theory there shouldn't be any passenger services except the odd brakevan special.


*That is if she doesn't crash it again - a week old and it is already in the body shop.

Friday, 6 December 2013

Two Plans

Llansilin Road


So these are the latest versions of the two plans.

First the modified version of Llanrhaiadr Mochnant based on the valuable  input from Richard Ough.


Perhaps the most obvious visual change is the move of the catch point at the up end of the loop. I've also dropped any hint of the second platform.

Then the modified version of TaOC, which isn't any more, because thanks to a suggestion from Kane the plan has shifted to being based rather more on Easingwold East but still with the station at the entrance to the scenic section and the goods shed at the down end.


Of course now the penny has dropped that since building this new compact design, provisionally called Llansilin is going to take the next eighteen months to two years then by the time I get to build Llanrhaiadr I might have enough space available to build it to fit a larger space so I can revert to a more spacious and authentic version. After all the kids are bound to leave home some time, aren't they?

Monday, 2 December 2013

Compromising Design

Few classic layout designs can have been both so inspiring and frustrating as Roy Link's "The Art of Compromise" in the October 1978 Railway Modeller.

I know I keep coming back to it on this blog, and I know others do as well.

I think, from a personal perspective, it is time for me to take a critical look back at that original article

The inspiration comes from the possibility that in a 6ft by 1ft space you can build a model that is "a subtle blend of the diorama... and a working layout" that is a "moderate operational unit itself" and that "incorporat(es) details not normally found on the average model railway"

Remember this was back in '78.  Lichen is king.

Roy's coloured illustration  accompanying the article is  itself inspirational, but so is the fact that the design could, in those days, be built using the readily available Prototype Models card kits, incorporated just about all the features of a typical branch line station except an engine shed, and had an interesting track plan that separated the loop from the platform. It is no coincidence that the same issue included an article on South Leigh station, again with a  track plan illustrated by Roy. South Leigh of the few stations designed on those lines. A subtle twist Roy added was the gentle curving of the track with hardly any of it parallel to the front edge of the baseboard.

So far so good.

The frustration sets in when people realise that Roy designed the layout with that tool most of us have some where - the optimistic pencil. You know the one, it allows you to draw that turnout in to fit a ridiculously small space and connect up two pieces of track without the need to check that the tangents align. The same pencil that convinces you that because there is clearance between a lineside feature and the centreline of the the track that you've drawn then there will still be clearance when the track is actually laid.

On top of that there is a presumption on the part of the reader, though never mentioned in the article, that a layout in the RM designed to use kit built buildings is probably one also designed to be built using Peco track.

I think that is probably the first pitfall people come across. I've spent hours in the past trying to come up with a workable plan using code 75 Streamline and this is still the closest I can get.


Actually perhaps it isn't that bad. I think it needs that one curved turnout to maintain the flow of the loop. However it certainly doesn't allow as much room for scenic development as Roy drew on the plan.

Roy also suggested the model would be suitable for operation by the then new Lima 45XX as well as a Metro Tank or a 14XX. That was certainly part of the appeal when I first saw the plan, even if it took me another thirty five years to buy the 45XX.

In reality though the use of anything bigger than a 14XX is a step too far to be practical.

I suspect as well many who have been attracted to this design because it has so many elements of a "proper" branch line terminus have been tempted to push the plan a bit too far  themselves by adding other features like an engine shed or a proper signal box. They then either decide it can't be done, or expand the design to fit in  a larger space.

Reading the article from today's perspective it is also interesting to see that the suggested baseboard construction was extremely traditional, including a Sundeala top.

So if the design is only marginally feasible in OO why am I still pursuing it as an option for an EM gauge layout?

Well first of all the 6ft by 1ft size has a very specific value in that it means it could fit across the length of my desk in the study.  That also means I could work on the layout in decent light. The possibility of using several small lightweight baseboards also means I'm going to be able to turn them around and over to get at things. Apa Valley has already taught me how important and useful that is at this stage of my learning curve.

Modelling the Tanat Valley brings another key advantage. The station buildings on the TVR were all quite compact, and the goods sheds road loading bay is at the end not the side, so you don't need to allow for as much space alongside the goods shed. That alone possibly saves a couple of inches of width.

There is the small issue that this isn't a track plan the TVR would have used, but it does contain elements lifted from individual stations. For instance the combination of the overbridge, platform, signal box and start of the loop is pure Blodwell Junction

As for the use of EM, well, we've already established that this is a track plan that needs hand built track, and I think, using Trax, that it just about works.


The observant will already have spotted that this involves exactly the same amount of track building as Llanrhaiadr Mochnant, whilst probably demanding a higher degree of accuracy. My other concern is that building small areas of scenery is actually more challenging than building relatively large ones. There is still scope to ease some of the curves, though the way Trax draws things on screen paradoxically seems to make things less smooth the further you zoom out. However the final decision to build will depend on a detailed design in Templot.




Saturday, 30 November 2013

The Cost of Compromise

I'm sat here enjoying one of those lovely late autumn, early winter days where the light is just right to take the camera out for a bike ride. Or, to sit down and make a serious start on the scary art of track laying.

It is is so so tempting to get the camera and bike out, but since my darling wife has gone out shopping for today perhaps it is time to take the soldering iron by the bit (I've done that a few times in the past) and get practical.

So I have done, though it being around fifteen years since I last built any track, and thirty since I last dabbled in EM, I'd forgotten how much preparatory work I had to do. Which is why I find time now to pause and reflect whilst the sleepers are steeping in point stain solution.

In a reply to a comment from Geoff I mentioned that I was struggling with the geometry of Llanrhaiadr Mochnant. A late night yesterday has seen some real progress made on that front. I'm still not sure how to reconcile all the photos but I've worked out some of the subtle curvature involved although at the cost of increasing the baseboard width to two foot. 

The apparently simple modification of swapping the in use platform from being on the down line to being on the up line of the loop has had an awful lot of knock on effects including the need to presume some alterations to the geography and history of the line. I'll share more on that when I post the next version of the track plan.

In the meantime I've started laying some track on the hastily constructed test baseboard. I'll spare you the photos for now, but being unable to resist the urge to place some OO gauge stock and the buildings from Apa on to it to see how it looks has made it rather obvious that I've subconsciously built the first couple of feet of "The Art of Compromise" 

At this stage we need to add another compromise into the mix, which is our new car. Somehow I've been persuaded that after a few years of running around in a comparatively spacious Merc A class that  we should buy another Toyota IQ before they go out of production at the end of the year. As the non-driver in the family I feel a little railroaded into this, but there you have it. Anyone familiar with the IQ will recognise that one description that can't be applied to the luggage space is "spacious". Not that that should matter, of course, because in theory the layout doesn't need to be portable.

If I did go down the route of building TAOC it would still be an intermediate step to LM. Llansilin Road would be the obvious Tanat Valley station to adopt to suit with a  few elements of Blodwell Junction thrown into the mix.

Lets see how the track building progresses this week.




Thursday, 14 November 2013

A Question of Logic

I've had my thinking hat on again, in another attempt to synthesize Lanrhaiadr Mochnant and The Art of Compromise to produce a version that won't take up too much space in the office.

Point rodding in blue

Compared to earlier versions I'm planning to swap the viewing side over, so the goods shed will be at the front, as it is on Apa. Compared to the real LM the big changes are the replacement of the level crossing with a bridge and moving the main platform  to the down side of the loop. A quick reminder that in any case the model is going to be set both after passenger working ceased in 1951 and after LM became a terminus in 1952. Changing the level crossing for a bridge means I have to decide where to put the motley collection of sheds and the weighbridge. I suspect I won't reach a final decision on that until I place some mock ups on the baseboard. I don't think there is actually an obvious on scene location for the weighbridge that makes sense . A couple of other bits of the jigsaw have now fallen into place, including where the iron mink stood that was used for additional storage in the yard.

The jigsaw I'm not so sure about involves the points and signalling, because some of the edges of the puzzle are missing. Literally so when it comes to photos.

You might need a pen and paper for the next bit....

What I do know is that the LM lever frame had twelve levers, and Mike Lloyd records ten of them being in use at some point in time. I'm fairly certain that four levers were for signals. I know that three sets of point rodding ran along the downside of the line and I'm presuming two of those operated the points at 7 and 8. I'm guessing that point 8 at least had a facing point lock, which could account for the third rod, though the onlyTVR  FPL I have a photo of, at Llansilin Road, appears to have been operated off the same lever as the point.

Is it possible that point 7 didn't have a FPL because passenger trains wouldn't have used it in the up direction, or would it have had an economical FPL? In that case though wouldn't the FPL' for points 7 and 4 have been of the same kind, so why would they need rods from the lever frame?

Two rods pass under the loop, one of which then runs along the down platform towards the cattle dock siding. I think this continues to the catch point on the cattle dock siding. The second one, I presume, controls the catch point on the goods shed siding.

Three sets of rodding run alongside the up platform. One crosses under the loop at the end of the platform and controls point 5, so I'm guessing the remaining two control point 4 and its FPL.

That by my calculations comes to eight sets of point rodding, and four signal cables.

So the next question is what levers would have controlled what, and how would the interlocking have worked. Using TRAX 3 this is my best guess so far





It seems to work for most of the obvious movements and conflicts I can think of. When/if I get around to building it I'll be using DCC so at least I'll be able to amend things. Any advice and observations at this stage though would obviously be more than welcome.

Tuesday, 12 November 2013

Outside In

Not for the first time I've been doing a lot of thinking about layout design.

If I was to wind the clock back a couple of years and ask myself what is different about my approach these days I don't have any doubt that the answer is that I'm now "driven by the prototype."

Now bear in mind that two years ago I thought I was as well, so what has really changed is my interpretation of what that means.

Some of it is that details I once thought were unimportant now matter to me. I never thought that I would spend my time at a model railway show looking at point rodding, but I do.

Moe importantly though is how this makes me think about how to put a model railway together. My mantra is becoming  "Prototype down, trackbed up"

I suppose I need to articulate this a little more, though to be honest I'm struggling to do so.

I think we often fall into the trap, I certainly did with Apa, of beginning with the track plan, not the overall track bed within the railway boundaries. Yet so much of the atmosphere of  railway is set within that extended area. To get that right it has to be thought about at the very beginning because it is very hard to retrofit features within that space, or perhaps more importantly, to increase that space if you haven't allowed for those features. Anyone who has tried laying point rodding alongside a platform when you've already ballasted the track will know what I mean. Getting the track bed right provides the backbone on which the rest of the layout is built.

I was looking at a layout the other day and thinking that had the builder thought through the infrastructure needed to operate the full size version it would have fundamentally where he'd positioned lineside features and acted as a natural brake on his tendency to cram in too much into too small a space. That is another tendency we all have I suspect, to want to cram in that little bit extra, and it starts at the design stage.

That's the trackbed up part of the equation. The prototype down part is perhaps harder to explain. For me I think it has strong links with photography, because I know what I want to to create in a model is a scene that can be photographed to resemble the real world. That doesn't happen by lucky chance...except perhaps it did int he case of Apa. What I think we do too often is build up layers of scenery in the hope that the final effect will be realistic, rather than deconstructing a scene and thinking about how to recreate it.

Monday, 9 September 2013

The Concept in 4mm

I described this in a reply to a comment as  the Apa box layout I should have built."

The piece of tissue paper was worried to death by one of our poodles


It would mean compromising the visual side of the model in favour of some operating potential. To make it work real care would be needed in blending in the back scene, and some trickery would be needed to convince the viewer that something actually exists off scene. I thought point rodding could be a good example of that, suggesting that there are actually turnouts at each end of the "loop"

The "ready weathered" Dapol gunpowder van is really dreadful

Is there any point in building it now? I'm not sure it. It is a chance to try out using the loco lift components to build both a traverser and a sector plate. I'm also going to need to try out EM track construction and this would seem a possible practical use of the first usable attempts. A baseboard should take minutes to knock up, and of course I do still have a spare Apa box.

So who knows, it might happen.

Friday, 6 September 2013

Lateral Thinking

A couple of thoughts have been kicking around my mind today.

The first is that I need a more lateral approach to the sector plate idea, or else it is going to take up a disproportionate amount of space when the layout is assembled.   I think the solution to this has been hiding from me in plain sight for the last few weeks. I think the way ahead lies with a combination of  Jack Trollope's "fiddlestick" idea for a micro layout  combined with the Iain Rice mini L girder sub base to produce a slide out section on which a sector plate can be mounted when the line is in use.At the moment I'm trying to avoid over complicating the design.

The other thought, having built one 4' x 2' baseboard is whether or not to build a layout that would just fit in that space as another stepping stone

My first thought was something like this.


It is based on an idea I had years ago for a OO9 layout based on Devils Bridge station on the VoR railway.. I've always like the idea of building a layout that provides a natural viewpoint that isn't square on and  I think this plan might just work, with a 16" long traverser hidden by the bridge just long enough to take a pannier and a short bogie coach.

Having my half scale baseboard to hand I mocked up a N gauge version to see how the angles actually worked out.


Along the way I ended up with that very curvaceous backscene and a suspicion that the way to make it work would be to do away with points altogether  and have two sector plates, with one short one accessed via a hole in the backscene hidden by the good shed, as it is on Apa Valley.



You know in N gauge that could fit into an Apa box.

In fact a little more experimentation this morning shows that in 4mm a Sentinel could fit on the short sector plate even on this 2ft by 1ft board


Tuesday, 3 September 2013

End of the Pier Show

I've always had a soft spot for pier railways. Perhaps it is because I grew up in Blackpool, with day trips to Southport, and then went to university within easy reach of Hythe Pier.

Today's post from Phil Parker got me thinking about the possibility of a pier railway in an APA box. Yes I know the Volks Electric Railway isn't, strictly speaking, a pier railway, although originally it was built on a pier like structure.

Actually looking at the legs of the pier in that photo they have a passing resemblance to the legs of the Dapol/Airfix water tank, one of which I happen to have lying around ready for the next project.



There are a couple of well known models around: John Goddard's model of the VER  and  Dave Carson's New Walmington Pier.

One of my original ideas for an APA layout was a Kinver style tramway, but a pier line might work rather better. In contrast to NewWalmington I would build it in OO9, since many pier railways were narrow gauge and model a mid section of the pier with scenic breaks provided by a car shed at the shore end, and a pavilion at the other. Langley Models do a whole series of kits and parts that would come in useful


And if you want a really crazy idea...

I was at Bridgnorth last week, which quite apart from the Severn Valley Railway is well worth a visit, not least because of the cliff railway.



Now Langley just happen to do a working model of a cliff railway so what if you stood an Apa box on end? The angle at which ir runs would have to be steepened, but that's been done on Cliffhanger so it is certainly feasible.

Sunday, 25 August 2013

Why I failed woodwork

I went to a grammar school that had a definite leaning towards developing practical skills, be they scientific, computing, technical drawing, woodwork, or metal work. they even insisted the boys studied home economics and sewing.

To be honest I pretty much flunked all those subjects, and an afternoon spent in the company of my rusting Black & Decker Workmate has reminded me why. Even when I know what I am supposed to be doing things go wrong, never mind when I'm trying something new.

So the end result is I have one mini baseboard to practice track construction on, and one very doubtful looking 4' x 2' baseboard to form the basis of LM. I might spend tomorrow building a the sector plate board, or at least the basic components of it. oddly I've decided to build the smaller of my two possible schemes. I'm also thinking about flipping it around so the sector plate will be in the corner of the room and the station area will be closer to window light.



If I was continuing with OO the appearance of the baseboard wouldn't worry me too much, after all it will have a cosmetic fascia attached to it - another job for tomorrow if I'm lucky. What worries me moving to EM is whether I've built it with a flat enough top for good running.

Still there is a lot of practicing to be done before I lay any track for real, and Templot to be mastered. If all else fails I'm sure I'll find some use for it,after all it will soon be November.

Friday, 16 August 2013

I am thinking

I've spent a lot of my life working in Germany, but have never managed to pick up the language, so I have some sympathy with this guy:

Meanwhile I've been doing some thinking of my own about baseboards and whether to go for the small or large version of Llanrhaiadr. After all I need the practice of building as many points as possible to gain confidence, and the large scheme only involves two more of them.
The other thought is about presentation. I would rather look at a model that is 100% scenic than one that it 50% sector table,

But then is there too much scenery in the large version, particularly at the right front? Or rather too much scenic space and nothing interesting to occupy it? Perhaps I could put some cottages there.

Then again perhaps the solution is a hybrid of the two with a  really short sector table that perhaps just replaces one of the points.

I think, once the rain stops, it is time to build the baseboards, print out some track templates, and play trains.

Sunday, 11 August 2013

Baseboards and Basics

When I was a child the family model railways were always built on big heavy baseboards with a Sundeala top, None of them, so far as I can remember, had legs, so they depended for support on whatever was convenient, and none of them consisted of more than one board.

My odd adult forays into indoor model railways have all involved small cameo scenes, and to be honest I have probably gone to the other extreme when it comes to their construction, being quite happy to use card, balsa, plywood and foam board. It is probably best to draw a veil over the fiberglass experiment.

One thing the Apa experiment has taught me is that there is no substitute for having a flat surface that can survive construction and scenic treatments without distorting. That is another way of saying the foam board  baseboard ended up getting so twisted that actually running trains is a bit of a lottery.

So for Llanhraiadr I'm planning to use Iain Rice's relatively lightweight L girder approach using cheap batten timber and a plywood top.In theory this should be simplicity itself to build, but I'm not looking forward to it. If I can get it to work though I've hopefully got a repeatable approach that will take a lot of the fear out of future projects.

The more I think things through the more I think there is too big a gap between what you can do as a modeler buying things in shops and what you have to do if you want to really start modelling something. There is no easy progression it seems. As soon as you want to move from playing trains you have to contend with a whole raft of new techniques, with no obvious or easy order in which to do learn them. Building baseboards, laying track, electrics, scenic work, buildings...all have to be developed in sync.

There must be a better way. If nothing else it should be possible to design a simple baseboard for beginners to build that would include a basic electrical bus.

Saturday, 10 August 2013

What next for the box?

So as the last few posts have made clear my focus is moving away from the current Apa project. That doesn't mean the abandonment of the Apa as a home for layouts.

The current model will stay in existence until Lanhraiadr is in an advanced state of construction, the bulk of my stock has been converted to EM, and I'm happy my skills have progressed to the stage where I can make better versions of the current structures.

Then what? Well one idea is to reuse what I can to build a OO9 cameo. or possibly a OOn3 one. I've also still got the 16mm version in mind. On top of that I quite fancy doing something a little quirky, perhaps a rural tramway of some sort.

Something that I still appeals about the Apa is that it blends into the furniture and that is a worry about building proper baseboards. The simplistic answer is to build a traditional black fascia, but lest be honest that is still going to draw attention to itself.

Thursday, 8 August 2013

Quiet Before the Storm

I'm sat here at eleven PM in my home office, having just about finished work for the day. The windows are wide open and I can feel a storm coming.  I can also feel a storm of modelling activity approaching. My darling wife is away for the next week which is a good time to arrange for a few parcels to arrive. In fact one already has, from C+L Finescale, but I'm not opening it just yet.

The combined contents of all the boxes heading my way should be more than enough to kick start my adventures in EM. The one thing I've forgotten to order in time is a set of wheels for the Sentinel from Ultrascale.

In a way this EM gauge goodness actually gives me a fresh impetus to finish the Apa project, and if the weather holds out I'm hoping that by Sunday it will at least appear finished.

So what is in the boxes?  Hopefully the makings of a couple of 4'x2' baseboards for a start, some basics to get me practicing track laying, and a Mainly Trains replacement chassis for the Ratio 4 wheel coach.. Plus a couple of structure kits for a cattle dock and a water tower which are called for by the new layout and which don't seem worth scratch building.

So if I'm about to start building baseboards do I have a final trackplan in mind?

Well yes, well two actually. Yesterday's ruminations about combining the real track plan from Llanrhaiadar Mochant, and two of my other favourite plans, Llanastr and The Art of Compromise have led to two options.

The first is the small space version, though that small space has now extended to 8' by 2' in total, including a sector table/traverser.


The second is 12' by 2' including the sector plate, and takes less liberties with Llanrhaiadr.


You might note that the first 4' of both plans look very similar. In fact the differences are down to some evolving thinking and the idea is to begin with the first plan and then extend it by inserting a middle board. A few things would need adjusting, notably the positioning of the weighbridge and the ground frame. The first wouldn't really be a problem, the second would because it would mean rerouting the point rodding. I might take the easy way out and leave the ground frame off stage for the first iteration.

One consequence of using the first plan is that operation could be a little odd, or interesting, depending on your point of view. Imagine a passenger train pulling in.  By this stage in its history Llanrhaiadr had become the terminus of the Tanat Valley, and only the old up platform was in  use. Given the limited space probably just the one bogie coach would be in view. So the loco uncouples and runs up to the water tower, then runs round back out of sight under the bridge....ah and you see now it doesn't matter whether that is the engine which couples back on to the train or not, because it is out of sight, which frees the original train loco to do something else.

Tuesday, 6 August 2013

Planning

As you might be able to tell my thoughts are now very much about the next layout, with the end very much in sight for this test piece. By the end of next week I'm hoping to have the bulk of the vegetation in place, and the platform in an overgrown state. That then leaves the signal box to be built as and when.

Meanwhile I've joined the EMGS - or strictly speaking rejoined it since I was a member in my late teens - and ordered a few things to get me started. Nothing too serious, but it does feel a bit chicken and eggish trying to work out the best way to start without incurring a massive expense.

It is half tempting as a test piece to build another version of this layout, but to be honest I think moving up to EM will take up just a little too much space to successfully  fit the same layout in an APA box. However I could fit it on to a bigger baseboard.

The best idea will be to build something that can eventually be incorporated into Llanrhaiadr, but to be honest I suspect the learning curve is going to be pretty steep and the chances of wanting to keep my first efforts are pretty slim.

And then, once again, there is The Art of Compromise which I've already blogged about once. Yet what I failed to pick upon at that time is the the track plan for Llanrhaiadr is essentially the same as that of The AoC,but with the station moved to be on the loop. Of course the interesting thing about TAOC is that the station wasn't on the loop.

Llanrhaiadr 8'x2'
Somewhere between the two is perhaps where the swee-tspot lies, with a bit of Llanastr thrown into the mix

Llanrhaiadr Mawr 6' x1.5'



Monday, 5 August 2013

Signalling Diagram

In the absence of a signal diagram for Llanrhaiadr Mochhnant I thought it would be relatively easy to convert the signal diagram of Llangynog. Here's one I did earlier.


It seems my Photoshop skills are a bit rusty, because it has taken an hour and I really need to start again.



So I did, this time using Anyrail to produce the basic diagram. This is just the basic export tweaked in Snapseed. The next step will be to combine this with the text from the version above, and another version with the switches in yellow so the blue indicates the alternative route. And here we have the finished version:



Why am I doing this? Well I'm enjoying the challenge, of course, but if I ever do build LM it would be useful supporting material for display with the layout. The main reason I'm doing it though is actually to check that I've got the point rodding arrangements right. I think I'm now pretty sure what went where now. Well almost, I'm not sure if I'm right in putting a facing point lock at the up end and that there isn't a second catch point to protect the running line from the loop at that end. What I do know is that there are two sets of point rodding running in that direction.

Tuesday, 28 May 2013

Getting Carried Away

"So" said the step-daughter  "is that it or are you going to do something else?"

Given my rate of progress it is jumping the gun to be thinking about the next project, but I have been giving it some consideration.

The easy route to take is simply to build a new EM gauge version of this model, embracing all the lessons learnt to date, reusing anything I think is of sufficient quality, and pushing the envelope slightly out of my comfort zone. It would allow a before and after comparison to be made, after which the before would be consigned to the bin. But what if I were to consider a layout, rather than a diorama/shunting plank?

New Radnor is one obvious choice, not least because the line is relatively local to my old home in Herefordshire.  Then there is Blodwell Junction itself,rather than my truncated version, or the terminus of the Tanat Valley at Llangynog.

Like many of my generation of railway modelers there is also the attraction of Roy Link's "Art of  Compromise" design.

Where I think I'm actually heading is towards Llanrhaiadr Mochnant, which became the terminus of the line after the closure of Llangynog. I think a design based on this period would have potential.

Plan created in AnyRail 4
Actually the trackplan itself is very close to that of Llangynog when it was first opened, which is useful because Lloyd's book includes the original signal diagram.